Launch offer — your SWMS is freeNORMALLY $7.99 · UNTIL 31 AUG · NO CARD NEEDED
BUILT FOR AUSSIE TRADES
WHS-COMPLIANT · ALL 8 STATES

SWMS SORTED BEFORE THE KETTLE'S BOILED.

Describe the job like you'd tell your apprentice — type it, talk it, or snap a photo. We build the job steps, hazards, controls and PPE for your state, ready to sign and take to site. No templates, no account.

✓ NO SIGN-UP✓ NO CARD NEEDED✓ FREE UNTIL 31 AUG
SAFE WORK METHOD STATEMENT
SWMS-2608-041 · REV A
PCBU
Harbour City Roofing Pty Ltd
PRINCIPAL CONTRACTOR
MG Constructions
DATE
02 AUG 2026
PROJECT / LOCATION
Roof replacement — 14 Keeler St, Parramatta NSW
STATE / REGS
NSW · WHS Reg 2017
HRCW:
FALL RISK >2M
ASBESTOS (POTENTIAL)
JOB STEP
HAZARDS
RISK
CONTROL MEASURES
RES.
1. Site set-up & access
Public access · deliveries
M
Exclusion zone + signage; deliveries booked off-peak
L
2. Install edge protection
Falls >2m · falling objects
H
Guardrail to AS 4994 by ticketed crew; no-go zone below
M
3. Strip existing tiles
Falls · asbestos · dust
H
Pre-start asbestos check — stop work if suspect; P2 masks
M
PPE:
HARD HAT
HI-VIS
BOOTS
GLOVES
HARNESS
P2 MASK
PREPARED BY / SIGNATURE
REVIEWED BY (COMPETENT PERSON)
SWMS SORTED · GENERATED 02/08/2026PAGE 1 OF 6
GENERATED IN 47 SEC
READY TO SIGN. READY FOR SITE.
01 YOU TYPE IT
02 IT WRITES THE METHOD
03 HIGH-RISK WORK FLAGGED
04 SITE-READY PDF

Scroll. Watch it build.

THE JOB — IN PLAIN ENGLISH
Replacing the colorbond roof on a two-storey weatherboard house in Newcastle. Strip the old sheets, new battens and insulation blanket, re-sheet with Colorbond. Crew of three, scissor lift and harnesses, about two days.
⚠ HIGH-RISK WORK — FLAGGED AUTOMATICALLY
1. WORK AT HEIGHT — FALL OF MORE THAN 2 METRES
11. MOVEMENT OF POWERED MOBILE PLANT
01
Set up exclusion zone, position scissor lift
FALLING DEBRIS · PLANT MOVEMENT · OVERHEAD POWER
H
02
Install roof anchors and static lines
FALL FROM HEIGHT >2M · ANCHOR FAILURE
H
03
Strip existing sheeting and battens
SHARP EDGES · DUST · FALLING MATERIAL
H
04
Lay insulation blanket and new battens
MANUAL HANDLING · FRAGILE SURFACE
M
05
Fix new Colorbond sheeting
WIND-CAUGHT SHEETS · POWER TOOLS
H
06
Clear waste, demobilise, final inspection
MANUAL HANDLING · SITE ACCESS
M
10 JOB STEPS · 31 HAZARDS · NSW
✓ CREW SIGN-ON INCLUDED
BUILD YOURS — FREE →
LAUNCH OFFER · NO CARD NEEDED
DEMO — THE 60-SECOND BIT

Pick a trade. Watch it write.

JOB STEP
HAZARDS
RISK
CONTROL MEASURES
RESIDUAL
1. Install edge protection
FALLS >2M · FALLING OBJECTS
H
Guardrail to AS 4994 installed by ticketed crew; no-go zone below the work face.
M
2. Strip existing tiles
ASBESTOS (PRE-1990) · DUST
H
Pre-start asbestos check — stop work and call a licensed assessor if suspect; P2 masks.
M
3. Fix Colorbond sheets
WIND-CAUGHT SHEETS · POWER TOOLS
H
No sheet handling in winds over 35km/h; sheets passed hand-to-hand; RCD-protected tools.
M
4. Waste off-site
MANUAL HANDLING
M
Waste lowered by chute — nothing dropped from height; team lifts over 20kg.
L
▶ WRITING THE METHOD…
NOW DO YOURS →
CONDENSED FOR THE DEMO — YOUR REAL SWMS RUNS THE FULL METHOD, PPE + EMERGENCY PLAN.
HOW IT WORKS — 01 → 03

THREE STEPS. NO DRAMA.

YOUR SMOKO TAKES LONGER THAN THIS.
01
Tell us the job

Type it, say it, or snap a photo of the site. Use whatever slang you want — sparky, chippie, dogman. We speak tradie.

two-storey re-roof, colorbond, crew of 3
02
We build the doc

Job steps, hazards, controls, PPE, emergency procedures — matched to your state's WHS regs, with high-risk work flagged.

15 HAZARDS MATCHED
CONTROLS + PPE WRITTEN
2 HRCW CATEGORIES FLAGGED
03
Sign & go

Review it, tweak anything, pay, download the A4 PDF. Rock up with the paperwork sorted and get on with the actual job.

SWMS-2608-041.pdf · 6 PAGES↓ PDF
INPUT — ANY WAY YOU LIKE

Not your grandpa's safety form.

VOICE INPUT
Talk it out.

Can't be bothered typing? Tap the mic and describe the job — slang and all. A twenty-second ramble comes out the other side as proper job steps, hazards and controls.

● REC 0:14
"Roof replacement on a two-storey in Parramatta. Ripping off the tiles, re-sheeting with Colorbond, crew of three…"
PHOTO SCAN
Snap the site.

Photo of the work area in, hazards out. Overhead lines, open penetrations, missing edge protection — spotted and written straight into the document.

JOB-SITE PHOTO
HAZARDS DETECTED
3
OPEN TRENCH — NO BARRIERS
MISSING EDGE PROTECTION AT 4M
OVERHEAD POWER WITHIN 3M
THE DOCUMENT

What lands in your PDF.

Every SWMS follows the Safe Work Australia model format — the layout builders and site supervisors expect to see at induction.

01
Project & PCBU details
02
High-risk construction work categories
03
Job steps with hazards & controls
04
Risk matrix — before & after controls
05
PPE & plant register
06
Permits & emergency procedures
07
Worker sign-off sheet
READ A FULL SAMPLE — FREE ↗
REAL 5-PAGE DOCUMENT · ROOF REPLACEMENT, PARRAMATTA · NO EMAIL NEEDED
SAFE WORK METHOD STATEMENT
SWMS-2608-041 · REV A · PAGE 2 OF 6
RISK MATRIX
LOW
MED
HIGH
EXTREME
JOB STEPS 4 — 6
EMERGENCY PROCEDURES
A4 · PRINT-READY
MODEL FORMAT ✓
COMPLIANCE

Compliant in every state and territory.

Built on the model WHS Regulations and your state's codes of practice. The 18 high-risk construction work categories are flagged automatically wherever they apply to your job.

NSW
VIC
QLD
WA
SA
TAS
NT
ACT
STRAIGHT UP —

A SWMS must be reviewed and signed by a competent person before work starts, and workers must be consulted on it. We build the document properly — the sign-off stays with you, exactly as the regs intend.

PRICING — FREE DURING LAUNCH

Cheaper than a slab.

No account. No subscription. No card — free until 31 AUG.

SINGLE SWMS
FREE
$7.99

For one-off jobs, or giving it a crack.

Full A4 PDF — editable before download
Compliant in all 8 states & territories
Voice & photo input
Free regeneration if it's not right
BEST VALUE
3 DOCUMENTS
3-PACK
FREE
$19.99

For crews juggling more than one site.

Everything in Single
Tokens never expire — use anytime
Three documents, nothing to pay
NOT USABLE? REGENERATE FREE — OR FULL REFUND WITHIN 7 DAYS. NO FORMS, NO ARGUMENT. READ A SAMPLE FIRST ↗
FAQ

Fair questions.

Is it actually WHS-compliant?+

Every document follows the Safe Work Australia model SWMS format and is matched to your state's WHS regulations and codes of practice, with high-risk construction work categories flagged. Like any SWMS — bought, templated or written by hand — it must be reviewed and signed by a competent person before work starts.

Do I need an account?+

No. Describe the job, review the document, pay, download your PDF on the spot. A receipt goes to your email — that's the whole relationship.

Can I edit the SWMS before I pay?+

Yes — every job step, hazard and control is fully editable before you pay. Reword anything, untick what doesn't apply, add what's missing. You only pay when it reads right.

Which trades does it cover?+

Any construction trade — electrical, carpentry, plumbing, roofing, concreting, scaffolding, demolition, excavation and the rest. If the job's unusual, just describe it plainly and the method comes out specific to it.

What if the builder knocks it back?+

Regenerate it free with the feedback you got. Still not usable? Full refund within 7 days — no forms, no argument.

Right. Let's knock it over.

Describe the job now — it's free this launch run, and there's no card to enter.

BUILD YOUR SWMS NOW
NO ACCOUNT NEEDED · NO CARD NEEDED
SWMS SORTED
PRIVACYTERMSREFUNDSCONTACT
SWMS BY TRADE
ELECTRICIANPLUMBERBUILDERROOFERCONCRETERPAINTERWELDERDEMOLITION WORKERSCAFFOLDEREXCAVATION WORKERCONFINED SPACE WORKERCARPENTERTILERBRICKLAYERPLASTERERLANDSCAPERAIR CONDITIONINGWATERPROOFING
SWMS BY STATE
NSWVICQLDWASATASNTACT
© 2026 SWMS SORTED · BUILT IN AUSTRALIASWMS DOCUMENTS MUST BE REVIEWED BY A COMPETENT PERSON BEFORE USE ON SITE.