SWMS SORTED
START A SWMS →
BUILT FOR CONCRETERS

Concreter SWMS Generator

Concrete work involves heavy machinery, chemical exposure, and high-risk activities like tilt-up panel work. We generate concreting-specific SWMS that cover formwork, pouring, pumping, and finishing.

Generate Your Concreter SWMS — $7.99 →READ A FULL SAMPLE ↗
✓ 60 SECONDS   ✓ NO SIGN-UP   ✓ EDIT EVERYTHING BEFORE YOU PAY

Why concreters need one.

Concreting crosses into high-risk construction work more often than people think: tilt-up and precast panel work has its own HRCW category, and work near powered mobile plant covers the pump, agi trucks and bobcats moving around your crew on most pours. Add formwork at heights or footing trenches past 1.5 metres and a routine pour can carry several SWMS triggers at once — and the SWMS has to be in place before the first truck backs in.

Common concreter hazards covered.

!Concrete burns from wet concrete
!Silica dust exposure from cutting
!Manual handling of heavy formwork
!Concrete pump line whip
!Tilt-up panel collapse
!Concrete truck interactions on site

High-risk work it flags.

CONCRETER WORK TYPICALLY TRIGGERS THESE HRCW CATEGORIES — WHS REGULATION 291:

CONCRETE OR MASONRY WORK (TILT-UP OR PRE-CAST)
WORK NEAR POWERED MOBILE PLANT
WHAT YOU'D TYPE IN

Pouring a suspended concrete slab for a two-story commercial building. Setting up formwork, placing reinforcement, and pumping 40m3 of concrete.

WE TURN THAT INTO THE FULL DOCUMENT — STEPS, HAZARDS, CONTROLS, RISK RATINGS, PPE, EMERGENCY PLAN AND TOOLBOX TALK.

What lands in your concreter SWMS.

Scope of work description
HRCW activity identification
Step-by-step work procedure
Hazard identification per step
5×5 risk matrix (initial & residual)
Hierarchy of controls
PPE requirements with AS/NZS standards
Emergency procedures
Toolbox talk pre-start briefing
State-specific legislation references
Digital crew sign-on with QR code
Your logo, ABN and letterhead

Fair questions.

Is concreting classed as high-risk construction work?+

Not automatically — but it gets there fast. Tilt-up and precast concrete work has its own HRCW category, and work near powered mobile plant captures the pump, agi trucks and bobcats on most pours. Formwork at heights over 2 metres or footings deeper than 1.5 metres add more triggers.

Do I need a SWMS for a house slab?+

If any high-risk construction work is involved — like a concrete pump or excavator operating near your workers — then yes, before the pour starts. Even where it's not strictly required, most builders won't book you without one on file.

Does silica dust need to be in my SWMS?+

If you're cutting, grinding or drilling concrete, absolutely. The SWMS should nail down controls like wet cutting, on-tool dust extraction and the right respirators. Every state WHS regulator has crystalline silica in its sights, so this is not a section to skim.

What's different about tilt-up and precast panel work?+

It's one of the named HRCW categories, so a SWMS is mandatory before panels move. It needs to cover the lift plan, crane and rigging, propping and bracing, exclusion zones, and who controls the drop zone. Panel work is unforgiving — the paperwork needs to match.

Who signs the concreting SWMS — my crew or the builder's?+

Your crew — everyone doing the work the SWMS covers, before it starts. The builder gets a copy, but the signatures come from the people on the tools. Ours has digital sign-on via QR code, so the whole crew can sign from their phones at the pre-pour toolbox talk.

SWMS for every job.

BY TRADE
BY STATE

Your concreter SWMS, sorted.

Describe the job like you'd tell your apprentice. Review every step. Pay when it reads right.

Generate Your Concreter SWMSFREE
NO SIGN-UP · NO CARD NEEDED · FREE THIS LAUNCH RUN